I was thinking less about the consequence of in-house construction management on the site (in the mere sense of the plan-actual comparison of executed trades). Rather, about the problem that F is working slowly and shifts the other trades so much that, because M is not available until much later, M now suddenly has to come before K, which causes K and L a lot of fiddling and overhead hours. But well, that little bit of household can't be that hard, says Johanna von Koczian's husband
 

Grantlhaua

2019-10-14 06:39:34
  • #2
That can happen to you too, unless you have a


But that can also happen to you with external construction management. I know people who have been building for almost two years and still aren't inside.


Please give feedback again, how is it going? Are you keeping the plan as is? What suggestions are being considered?
 

haydee

2019-10-14 07:31:19
  • #3
Over 2 years There are also 2 in our town. However, without construction management One wants to make it by Christmas. With unplanned own work and additional money.
 

Grantlhaua

2019-10-14 07:39:00
  • #4


We manage in 10 months with individual trades contracting. Something would have to go completely wrong now for us not to move in by January. So it can go either way. If there is a lot of own work added, it’s pure stress, but it’s also fun

Well, let’s see what else will tell us about
 

haydee

2019-10-14 07:49:29
  • #5
Great
The two of them repeatedly have downtime for weeks, sometimes rather months.
I don’t know if it’s only due to the shortage of craftsmen.
The roofs for the outbuildings were enough for me. I don’t want to build a house like that.
10/17 Roofer 1 says it’s too complicated for me, I’m not doing it after all.
2/18 through connections we got one with a promise to be finished by 12/18
9/19 it was finished
Long-term sick, no replacement
 

canerol

2019-10-14 08:06:11
  • #6
Yes, we will go the route of self-awarding contracts; for me, it is about having maximum flexibility here and being able to make "smaller" changes during the construction phase. I believe that this way we can build with better quality. Definitely, in my opinion, this is the most difficult way to build.... Yes, we also live near the construction site and will be accompanied by the TÜV and a structural engineer. We are aware of the dependencies of the individual trades, that if one trade falls behind schedule, then the other trades will also be delayed in time and therefore the craftsmen cannot keep their appointments. We trust our construction controller who has a large network of craftsmen and can therefore fall back on alternatives. Returning once again to the overall budget, as I have already written, we will obtain the craftsmen’s offers in the next few weeks; if our cost estimates are not sufficient, we will increase our budget.
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
20.11.2017Deficient construction management - expert confirmed this14
11.10.2018Waste on the construction site - What is tolerable?138
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
19.08.2021House building - an eternal construction site?33
21.09.2022Camera / mobile phone for documentation in the workshop or construction site13

Oben