I don't want to suggest any changes to the floor plan because, like ypg, I have the impression that the clients love their design too much since it includes almost everything that one needs today. I rather have the feeling that the floor plan will only be critically reviewed once the first complete and concrete offers are available and it turns out that 100,000 euros are missing from the budget. I would recommend revising the house on the left side, shortening it, and letting go of the ideal utility room with garage access, realigning the kitchen, and removing the third shower from the guest toilet. With a > 80 sqm basement and a big garage, I don't need a large storage space. Personally, I would forgo the basement and try to structure better above ground. If the development plan allows it, I would, if necessary, enlarge the footprint and build 110 sqm per floor.