Yosan
2019-08-06 07:05:00
- #1
We are currently building with Town & Country and already received a calculation at the first meeting back then. It was only minimally adjusted here and there later on, and otherwise left as is, and so far everything works out. However, I believe the costs were estimated higher than yours. I can gladly check tonight. But I am at least sure that 2000 or 2500 was assumed for the construction electricity. And of course also a sampling buffer. Regarding the samplings, I have to say that we were positively surprised by many additional charges and in some areas didn't sample at all. So if you don't have any special requests, 10k should easily be enough. At least it was enough for us despite spending 4000€ just on the roof tiles.