However, this price does not yet include special requests, the base slab, house connections, earthworks, etc. (from my experience).
 

Alfonso

2014-06-20 11:02:19
  • #2


Yes, I know - house connection, base slab, earthworks, base slab etc. I have summarized in the calculation of land costs and are not included in the 135,000 +25%. So it is an additional item.
 

ypg

2014-06-20 13:53:31
  • #3
You are summarizing the costs incorrectly. There are land and incidental construction costs. In addition, there are house costs, equipment costs, costs for own work, as well as outdoor facilities. You cannot take a general buffer for costs that are guaranteed to come up for you. A buffer is meant to cover unforeseen expenses and is usually already spent before the own work begins. You also have to read the link for the house and incidental construction costs correctly. Doesn’t it seem strange to you that your calculation is below the 150,000 price segment, while everyone else in this forum is far above the 200,000 EUR mark??
 

Alfonso

2014-06-20 13:55:57
  • #4
Uh, all in all I come to about 280,000. Possibly a misunderstanding?
 

Wallyfan

2014-06-20 14:04:53
  • #5
Just have an offer made for the [desired house], then you have a large item relatively fixed in the calculation.
 

Alfonso

2014-06-20 14:05:41
  • #6
Ok, maybe I also summarized the costs incorrectly.

I'll take your breakdown then:

Land costs: 70,000 + 4,900 incidental purchase costs
Additional construction costs: 21,000
House costs: 135,000
Equipment costs: 33,750
Own labor costs: 10,000
Outdoor facilities: 15,000
Buffer: 20,000 (increased again)

Hmm - it seems I must have estimated something too low.
 

Similar topics
18.10.2012Ancillary construction costs and general expenses for a new semi-detached house14
09.06.2013Costs of earthworks without basement15
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
22.08.2013Are the estimated costs of the general contractor for earthworks reasonable?12
11.10.2022List of incidental construction costs. More expensive "on the builder's side"?154
15.07.2014Foundation slab for Danwood bungalow? Company for complete works?11
26.04.2016Sand, gravel, and other earthworks32
23.06.2016Additional construction costs ... but which ones?39
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
29.10.2018Earthworks in the construction performance description17
14.10.2019Dampness in the basement on the floor slab and walls25
04.05.2020Assessment of land - hillside location15
09.09.2020Calculation of a prefabricated house19
08.09.2020Earthworks costs, hillside house14
10.12.2020Assessment of Additional Construction Costs - Have I considered everything?34
06.02.2022Are additional construction costs realistic? - 175m² living area KfW 5515
15.03.2022Cost planning for earthworks33
07.05.2023Is it sensible for the expert to inspect the base plate?55
06.04.2023Evaluation of construction project with maximum own efforts36
07.02.2025Cost issue for earthworks on a slope22

Oben