Experiences and advice on planning a single-family house - advice or feedback?

  • Erstellt am 2025-10-08 12:36:11

JulianR

2025-10-09 15:14:48
  • #1
Thank you! That certainly gives me something to think about, see previous post...
 

ypg

2025-10-09 16:29:07
  • #2
I don't know what role the other floor plan (the one with the side entrance) plays now, but in this Artis floor plan the kitchen is basically the heart of the house. You take the soul away from the house by closing it off.
 

11ant

2025-10-09 18:02:28
  • #3

You shouldn’t discuss the planning among yourselves as laymen and then go to a company that has something similar as a catalog model. Instead, you should find a sales-independent building consultant (architects are not the worst for that) and discuss the planning with them.

You are basically thinking correctly, but the basement stairs would then have to be attached at the exit or the two closet niches in the study and in the “hallway” part of the living room would disappear. Overall, however, the floor plan set shown on the website does not appear to me to be a bestseller – consequently, I suspect this model is built more often in varied forms than in the "original". But this is exactly the core advantage of choosing a catalog model.
 

motorradsilke

2025-10-09 19:03:36
  • #4
Consider with the basement whether you can not completely sink it, but let it protrude 1 meter out of the ground. Then you can also get rooms with living quality there, if you want.
 

tomtom79

2025-10-09 21:02:16
  • #5

Depends on the company, the interior finishing at Schwörerhaus is completed in under 4 weeks, because the pipes are embedded in the walls and the screed is transported to the construction site as prefabricated parts. Outside, it is also plastered mechanically in the factory and only the corners are done on site.
 

tomtom79

2025-10-10 12:38:49
  • #6
This joint is no longer available on request "extra charge". Above all, the aforementioned is visually separated with other materials.
 

Similar topics
01.04.2020Construction Manager Area Neukirchen-Vluyn (Duisburg/Kleve/Wesel)10
10.02.2014Commitments from the construction manager - Trust relationship13
09.03.2014Construction manager missing10
25.07.2014Great house with some limitations. Access / insulation14
14.11.2016Bathroom ventilation drips despite pipe insulation10
27.11.2016Double insulation below and above the floor slab?10
01.02.2017Basement originally partially concrete, now possibly completely brick-built28
17.03.2017Exterior walls built with a 4cm tilt31
08.01.2018Single-family house - Opinions on our design159
13.11.2017Construction scheduling - Who has to create it? General contractor, site manager?11
15.01.2018Can a construction manager resign due to poor performance?16
22.04.2018Construction is continuously delayed - call the site manager?36
31.05.2019The construction manager does not come, does not check, or he doesn't care about anything16
24.06.2019Garage self-built, but which garage roof to choose?17
12.08.2019First appointment construction manager - Tips?11
16.11.2020Large garage single-family house - prefabricated or brick-built?67
09.05.2021Interior walls made of drywall or masonry?18
22.07.2022Insulation for the top floor ceiling - which material?14
16.12.2022Forgot insulation on the dormer wall - mold on wood - what to do?13
28.07.2025The contractually agreed construction manager will not be provided by the construction company.23

Oben