hanghaus2000
2021-11-26 10:01:27
- #1
An objection is now really a bit late. In my opinion, the wall is 36 thick. It looks different in the floor plan. Unfortunately, the measurement cannot be read.
I don’t see any roller shutter box. Neither in the plan nor on the building.
What will the next floor be? Wooden construction? The section is not an execution plan, right? All the information is missing.
From a technical point of view, I do not see any problem with the changed construction. As for the reduced WF and the non-compliant execution, it is probably the same problem again: poor site supervision. We already said that back then.
I don’t see any roller shutter box. Neither in the plan nor on the building.
What will the next floor be? Wooden construction? The section is not an execution plan, right? All the information is missing.
From a technical point of view, I do not see any problem with the changed construction. As for the reduced WF and the non-compliant execution, it is probably the same problem again: poor site supervision. We already said that back then.