hanse987
2022-08-09 22:16:42
- #1
Is your property perfectly level, because on page 2 it states that the calculation assumes a maximum deviation of 10cm in the area of the building structure? This could be a point for the general contractor to save some money.
I have looked at the electrical area. Surely, a few more sockets will be added. Additionally, the network cabling for stationary devices and for access points will be included. Is a photovoltaic system being installed? If not, at least prepare everything for it. Also, prepare the connections for an electric car, and an additional LAN cable is not a bad idea. Is electricity needed in the garden? So far, there is only one socket included in the outdoor area. Is a standard doorbell at the front door OK?
I have looked at the electrical area. Surely, a few more sockets will be added. Additionally, the network cabling for stationary devices and for access points will be included. Is a photovoltaic system being installed? If not, at least prepare everything for it. Also, prepare the connections for an electric car, and an additional LAN cable is not a bad idea. Is electricity needed in the garden? So far, there is only one socket included in the outdoor area. Is a standard doorbell at the front door OK?