Electrician ran away just before the end, find a company to complete the work

  • Erstellt am 2022-02-27 13:59:27

hanse987

2022-02-27 21:51:12
  • #1


Which insurance is this?
 

Knöpfchen

2022-02-27 21:57:40
  • #2
As I have already written, with the signature on the application for the installation of the electricity meter, the signatory declares that the E— system is completed and is to be commissioned, thus this person is also liable at that moment. This is also stated on the completion report for the meter.. whether this is actually true does not interest the grid operator at all. After all, he has the signature for that. This person also simultaneously signs that your grounding system, which he probably has never seen, complies with the current regulations and has been installed accordingly. But what do you need insurance for in that case? I have been a registered installer since 1974 until today and have applied for numerous meters, but confirmations for insurances were never required. Enlighten me.
 

Similar topics
31.03.2015Property / Financing amount / Insurance? Experiences10
13.05.2016Which of you has disability insurance?114
22.02.2016Signature of the work contract before financing?15
04.04.2016Heat pump on separate meter or together with household electricity20
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
30.08.2017Signature of prefabricated house under reservation with right of withdrawal16
20.11.2017Consequential water damage - Experiences with insurance?25
17.11.2017Construction contract - What is regulated only after signing?10
27.03.2018Urge to sign due to price increase normal?50
05.06.2019Search for real estate loan advantages/disadvantages insurance vs bank22
04.08.2020Surprising price increase just before signing17
06.10.2021Photovoltaic system / heat pump, do you have 2 meters?55
14.06.2021Separate meter and electricity tariff for air-to-water heat pump sensible?103
03.07.2021Separate water meter for garden water - How to read the meter21
26.08.2022Is builder's liability insurance necessary for renovation in existing buildings?17
13.11.2021Requirements for ancillary apartment, wiring, meters, etc.13
11.02.2022Signature for the neighbor's construction project27
14.06.2023Heat pump and household electricity all through one meter25
25.09.2023The supplier has incorrect meter numbers in the system - what to do?42
31.10.2023Extra meter for heat flow tariff (heating electricity tariff) yes/no?36

Oben