the lifting-sliding system was delayed from the very first attempt, so the opening was temporarily closed during that time and the work inside the house progressed. electrical and sanitary installations are well advanced. the base plaster is applied. underfloor heating is coming soon. the screed cannot be laid up to the sliding door, so a second visit is necessary, as well as for the parquet, I believe the finishing plaster cannot be done either. those are the problems.