face26
2020-07-10 11:38:49
- #1
Just some ideas:
Do you have a soil survey and also know that the soil class is correct?
Does the construction contractor have experience in the area and assume a worse soil class?
Are the 8.8 EUR/m³ really accurate? For which soil class?
The landfills here charge by tons. Is it really m³?
The conversion factor for us was about 1.8. So 1m³ = 1.8 tons.
If the excavation is included in the flat rate, he will certainly include a buffer for it.
Do you have a soil survey and also know that the soil class is correct?
Does the construction contractor have experience in the area and assume a worse soil class?
Are the 8.8 EUR/m³ really accurate? For which soil class?
The landfills here charge by tons. Is it really m³?
The conversion factor for us was about 1.8. So 1m³ = 1.8 tons.
If the excavation is included in the flat rate, he will certainly include a buffer for it.