Thank you first of all for the detailed consideration. A few points regarding what I have calculated.
For the drilling, I took the highest per meter price I found with a simple Google search. Purchasing the land assumes that you do not encounter any "extreme" soil layers. According to a real estate agent who sells many plots in the town, the soil survey can be done at your own expense before purchase.
For the €7000 for the heat pump, I took a sample model with high performance including all materials.
The roof and stairs are not yet well-founded, as I estimated very roughly here. I probably have to rethink that. A chimney on the roof is not planned, since only the heat pump and no tiled stove will be used for heating and domestic hot water. Or have I overlooked something that might require a chimney?
The front door is a lot, I found examples on one side that already seemed expensive to me, I may have to adjust that upward.
Earthworks are included in the ancillary building costs and assume soil class 3. We will do the driveway ourselves only if absolutely necessary.
What I really forgot are the costs for cable ducts/pipes in the house.
Thank you very much in advance for the valuable tips and hints about where I am completely off. If I now have a concrete offer made for us, I have already gained better ideas.
For the drilling, I took the highest per meter price I found with a simple Google search. Purchasing the land assumes that you do not encounter any "extreme" soil layers. According to a real estate agent who sells many plots in the town, the soil survey can be done at your own expense before purchase.
For the €7000 for the heat pump, I took a sample model with high performance including all materials.
The roof and stairs are not yet well-founded, as I estimated very roughly here. I probably have to rethink that. A chimney on the roof is not planned, since only the heat pump and no tiled stove will be used for heating and domestic hot water. Or have I overlooked something that might require a chimney?
The front door is a lot, I found examples on one side that already seemed expensive to me, I may have to adjust that upward.
Earthworks are included in the ancillary building costs and assume soil class 3. We will do the driveway ourselves only if absolutely necessary.
What I really forgot are the costs for cable ducts/pipes in the house.
Thank you very much in advance for the valuable tips and hints about where I am completely off. If I now have a concrete offer made for us, I have already gained better ideas.