Here someone is venting frustration because apparently something is stuck somewhere, things are not progressing, and rent or availability interest is running longer than planned. Probably no sufficient reserve was calculated. I can understand, it was no different for us (5 months construction stop due to groundwater). But that should not distract from one’s own mistakes... If you want 0.2% per day delay, you should have had that included in the contract. If you want better windows, you should have ordered better windows. By the way, for penalties of this magnitude, you are not "powerful" enough. Maybe a VW or a BASF can get that into their contracts with construction contractors, but certainly not Willi Wutz, one of many building owners who are currently building with your main contractor...