Obstlerbaum
2019-02-12 11:54:57
- #1
An estimate accurate to 2,000 euros would already be a dream for an entire house in my opinion. If the plans for the home fail over 2,000 euros more in excavation costs, then the general calculation is wrong. There will always be some unforeseen items, and you simply must not proceed without a reserve.Without a soil survey, calculation is impossible, of course. But even then, my excavation contractor didn’t want to commit to any amount of excavation for the basement. I stick to my point: you only know the exact costs once the excavator’s invoice arrives. Not a minute earlier. Then they excavate 50 cm more on a 13x11m area and you immediately miss 2k€ of your budget. You have no idea how much I hoped it wouldn’t be 300 or 400 cubic meters. In the end, it was only 240 cubic meters. But you just don’t know beforehand. You can still do a lot of recalculating based on height data.