Commitment to the property and what comes next

  • Erstellt am 2020-07-22 11:38:08

11ant

2020-11-20 23:47:03
  • #1
I’ll answer you here instead of in the provider advertorial thread ;-)

1. probably most of them: foundation report up to construction water ...
4. isn’t the offer price from the top of the basement floor (OKKD), so the floor slab is additional?
The price can’t be all-inclusive carefree, and as a general rule for the construction service description: everything that is not explicitly included is extra aka “client-side.”
 

SoiCowboy

2020-11-21 00:04:22
  • #2
This is a sloping plot, isn't it?

Then the first step should be to go to the soil engineer and not to (Ver-) Schwörerhaus.

Otherwise, you will be a case for television after one year.
 

ypg

2020-11-21 00:28:48
  • #3
Schwörerhaus is prefabricated construction, then the base plate is added. Possibly also transport, portable toilet, container, and interior finishing. Or is it a shell house?
 

SimBaPa

2020-11-21 00:43:28
  • #4
Apart from that, your entire financing apparently stands and falls with the expected inheritance. With your net income of 3 k€, I already consider it quite ambitious to manage that. In any case, I’m keeping my fingers crossed for you.
 

Pinkiponk

2020-11-21 10:01:25
  • #5
And in the construction service description (Bauleistungsbeschreibung). ;-)
 

icandoit

2020-11-22 15:54:59
  • #6
What have you calculated for the extreme slope? In my opinion, a prefabricated house is not the optimal solution there.
 

Similar topics
21.10.2011Floor slab insulation "Yes!" or "No!"14
18.09.2012Construction of a base slab with frost skirt but without foundation10
31.05.2015Wastewater pipe concreted in the floor slab at the wrong location29
14.09.2012House financing - house, garage, and foundation slab approx. 290,000 EUR11
26.10.2012External perimeter insulation floor slab, basement mold risk11
21.11.2013Is the floor slab still possible this year?15
15.07.2014Foundation slab for Danwood bungalow? Company for complete works?11
13.03.2015Smart home automation at Schwörerhaus12
16.02.2016Dismantling - Transport - Assembly of a Prefabricated House15
19.02.2017What is a sensible house construction planning process?21
02.08.2018SchwörerHaus: Seam in the plaster between two floors? Is that so?27
18.04.2025Construction company wanted in the Stuttgart metropolitan area!212
29.10.2018Earthworks in the construction performance description17
23.01.2020Construction work description - Thin slab foundation disadvantageous?11
04.03.2022Property development - basement yes or no?75
30.07.2024Solid house or prefab house - experiences?39
07.05.2025Cost framework and negotiation scope for prefabricated houses24
29.01.2025Is Schwörerhaus a premium provider compared to Streif Haus?22

Oben