E-gate with door, paving in a random pattern, 8cm thick, passable for 10t, due to moving, craftsmen and motorhome
That looks nice. Thank you very much for the inspiration!
You could have called the utility providers in the community today and asked. They have flat rates a) for the connections and b) for the extra meters.
[/QUOTE]To me, it’s all the same whether I have a prefabricated house or a solid house. However, the choice is still limited (which of course is manageable).
Yes, of course I have already informed myself in this regard. With Telekom it is actually a fairly simple flat rate and they also lay it into a pipe already prepared by you.
With the waterworks it is simply more complicated. They need a power of attorney from the owner and some technical information. The cost calculation then takes about 4-6 weeks.
So, unfortunately, just calling briefly and getting the price doesn’t work here.
With the thread I didn’t just want to find out the development costs regarding water and co but also items that I might have forgotten (e.g. the crane, solid house, etc.). For that, the thread has already been worth it for me.
I already knew that I have to pick up the phone myself :)
: Thanks for the info. Your costs for the internal development sound very reasonable. Even if it should be double for us, it would still be manageable. We also wouldn’t take gas.