Taitv789
2022-03-20 14:35:57
- #1
The construction has not started yet (but it is a developer project) and the conversation with the electrician is still to come.
So you wouldn’t install the wallbox yet and would only have the cable laid?
My idea was that I prepare everything with the electrician so that in, for example, 1 year I don’t have to call an electrician again and especially don’t have to look for which electrician is willing to come for 1 wallbox (they are all booked up).
Do I have to have a separate meter installed or is it enough if I have a wallbox with an energy meter (MID compliant)?
So you wouldn’t install the wallbox yet and would only have the cable laid?
My idea was that I prepare everything with the electrician so that in, for example, 1 year I don’t have to call an electrician again and especially don’t have to look for which electrician is willing to come for 1 wallbox (they are all booked up).
Do I have to have a separate meter installed or is it enough if I have a wallbox with an energy meter (MID compliant)?