Hello everyone,

which tasks are absolutely necessary for the electrician during the shell construction phase?
I think the house connection is the top priority, that is clear to me.

My concern is that I am just starting with the electrical planning, but the shell construction will begin in the next few weeks (I won’t be finished that quickly).
I want to do the chasing myself, that way you are flexible and can do everything once the shell is built... but WHAT should definitely be done by a professional while the builder is erecting the shell?

Best regards
 

opalau

2020-01-12 19:58:11
  • #2
The house connection is established when the house is sealed and the scaffolding is removed. Or do you mean construction power?

With us, the electrician came for the first time after the shell construction was completed to carry out the rough installation. Chasing, drilling, wiring.
 

Vicky Pedia

2020-01-12 19:59:40
  • #3
In the shell construction phase, the slots are made, boxes are installed, and cables are pulled so that everything later disappears in the plaster or screed. You will have to discuss the procedure with your electrician. Slots, breakthroughs, and riser routes depend on your requirements. You definitely need a plan for what goes where. Routes from the HAR to the rooms, don't forget the outside.
 

quattro123

2020-01-12 20:19:54
  • #4
OK great thanks for the answer. I can make slots once the shell construction is done. But the routes will presumably be set by the shell builder, at best, already directly during the shell construction phase?
 

Stefan890

2020-01-12 20:52:38
  • #5
In the concrete ceilings, the shell builder should provide appropriate openings, which will then be used for cable penetrations, etc. If you plan to install spotlights anywhere, have the suitable boxes installed there directly as well.
 

danixf

2020-01-12 20:55:06
  • #6
As long as the plaster/screed is not in, everything is basically irrelevant. You can do everything later, but the effort is somewhat greater.

For example, in my opinion, it would make sense to set ceiling outlets and pull cables in the case of a filigree ceiling so that you don’t have to go through 20+ cm of reinforced concrete later.
For spotlights, speak directly with the ceiling builder and have the boxes installed at the factory.
Before the windows arrive, already place empty conduits at the window so that the connection cable for the roller shutter can be routed.

The rest can be approached calmly.


As long as it’s not an industrial complex, you don’t really need "route planning." It would be good to talk to the sanitary installer about where he needs to run his pipes and also with the people responsible for ventilation in the screed. The channels are already relatively large, and in the end, almost everything usually goes into one room. It can get quite tight there.
 

Similar topics
16.07.2015Cable for outdoor lamp too short11
28.04.2016Order screed - plaster14
07.08.2016Upper floor without screed - only concrete floor15
09.06.2017Computer cables and Wi-Fi router43
19.08.2017Technical room before installing screed: should the technology be painted now or later?16
24.01.2018Is the floor still too wet or is it already normal?27
10.07.2018Does the structural builder have to paint the transition between styrofoam and brick wall black?12
02.08.2018SchwörerHaus: Seam in the plaster between two floors? Is that so?27
15.10.2018Is the shell construction overloaded? Current situation in the construction industry!13
08.11.2018Structural shell / Structural shell cost calculation - How does it calculate?52
05.01.2019Which UP boxes are used for network and for 5 cable entries?11
07.05.2020Cracks in the screed. Problematic?25
17.09.2020House connection pillar in the garden vs. house connection directly in the utility room35
12.10.2020Q2 Plaster cracks / minor defects - is this a defect or tolerable?17
01.09.2020Which conduit for LAN cable?32
22.12.2020Is it allowed to lay tiles on fresh screed?12
08.05.2021Connecting LED ceiling lamp - several cables hanging from the ceiling27
20.09.20225-pin cable to 3-pin cable13
13.03.2024Retrofit window closing contacts11

Oben