Vicky Pedia
2020-02-18 17:59:08
- #1
As far as I know, the steel bands must be connected with a "bolted clamp." With us, it was crimped.
Whether this was done with V4A steel in the concrete... I cannot say. At least from the outside, it is.
There is no documentation or pictures.
My construction manager only points out that I should have taken care of it!
Well, it doesn't quite work like that. The construction manager must issue a `construction management statement` in which he confirms the correctness of the execution. The contractor must also issue an `installer’s declaration` confirming the same. This includes measurement protocols.