Telekom usually pays for the earthworks + drilling (just not through a [weiße Wanne]). This costs €600. For that, you also have to specify everything very precisely (where the wall breakthrough should be, etc... etc...) For an external connection, you pay nothing because these services are not required. So why should I pay inside when everything is prepared identical to the external connection?