R0Li84
2016-07-15 13:57:25
- #1
For us, it was a cooperation between the local network operator and Telekom. Telekom charges the end customer, and the provider lays the line. Or did you pay the energy provider extra for the connection?
By the way: civil engineering work would come on top again ;).
Billed directly - for me, it is a small regional provider, not EON etc...