Question about surveying a property regarding the input plan

  • Erstellt am 2015-06-25 22:31:35

macrums

2015-06-25 22:31:35
  • #1
Hello everyone. I am completely new to the forum and have a question right away. I will be building a house at the end of the year and have the following situation: I bought a plot of land from a municipality in a new development area. It is fully developed, with a sewer on the property, etc. The plot is located in a new development area that was completely newly "created." Before, there was only meadow there. Now I have a construction company with which I want to build. The architect of this company says that for the submission planning he needs a surveyor to record the heights and boundary stones, etc. According to the offer, this surveyor costs 1300 euros. The man from the municipality says that all the data the architect needs can be taken from the official documents. Who has experience here? Who can tell me if I still have to have the plot surveyed? As far as I know, the surveying office will come again later to measure the finished building. How often do we actually measure? Land for sale, then again for construction and when it is finished once more? These are not insignificant costs! Thanks in advance for your help. Best regards from Augsburg
 

Bauexperte

2015-06-25 23:07:07
  • #2
The architect is right. I wasn't sure – I work in NRW – but a look at the Administrative Service Bavaria's website brought clarity:

Required Documents
    [*]current extract from the cadastral register [*]site plan, as long as it is not about changes to structural facilities where exterior walls and roofs as well as the usage are not changed

    and further documents
In the so-called preliminary site plan, all heights and sewer locations are drawn in, which are needed to determine the placement of the new building on the property as well as its connection to public utilities.

Once for the surveying of the property when purchasing it and 4 times for the house construction.

Edit: the surveyor is needed a total of 4 times; sorry, I formulated that unclearly.

Rhenish greetings
 

macrums

2015-06-25 23:09:27
  • #3
Hello construction expert,

thank you for your response.

Regards
Mac
 

laemat

2015-06-26 08:26:10
  • #4
Not quite, you need the surveyor 3 times
- Site plan for the building application (engineering service approx. 800 - 1000 Euro)
- Setting out of the foundation (engineering service approx. 400-500 Euro)
- surveying of the finished rising masonry, shortly after completion of the house or upon request by the cadastral office
(according to the fee schedule of the federal state 300-700 Euro)

Ergänzung d. Mod bzgl. Einmessung Kataster: In NRW z.B generell €830.- netto zzgl. MwSt. für Herstellungskosten bis 300T€ (ohne Grundstück) - Aussagen zu Kosten halte ich grundsätzlich für äußerst bedenklich. Die Kosten für die Einmessung eines Einfamilienhaus mit Herstellungskosten von +300T€ betragen in NRW bereits €1350.- zzgl. MwSt.; das sind brutto über 900€ / 130% mehr, als Du angegeben hast.

For comparison, the municipal utilities get 1200 Euro for a lousy gas connection, unfair world.
 

laemat

2015-06-26 08:39:11
  • #5
As a rule, a development plan area is marketed by a city-near development company or a private investor. Either a land consolidation procedure according to the Federal Building Code is carried out, a partitioning, or a "normal" survey. However, the buyers have nothing to do with this; the surveying costs for the division of the parcels are included in the purchase price. It may be that boundary points are not yet marked; here, one must check the purchase contract a bit to ensure that this point is regulated. The investor can waive marking internally; the marking obligation in this case applies only to public traffic areas. A small excursion into cadastral law

Note Mod: This is the regulation (presumably) in MV. Cadastral laws in other federal states sometimes have significant deviations. In NRW, for example, there is basically a marking obligation for property boundaries. Therefore, always check the respective state laws.

It is best to call the surveyor involved in the project; surveyors have a helper syndrome.
 

Bauexperte

2015-06-26 10:35:37
  • #6


    [*]Anyone who buys a property that is not yet registered as an independent property in the land register and cadastre (e.g., in a newly developed residential area) needs a surveyor for the so-called subdivision survey. This is necessary to apply for the registration in the land register and to initiate entries there (financing).
    [*]To prepare the building application, a preliminary site plan is required. Once the design planning is completed, it is sent to the surveyor so that they can enter the ground floor in the site plan and verify the setback distances.
    [*]Rough and fine staking out
    [*]Surveying of the finished building for the cadastral office

Rhenish regards
 

Similar topics
10.12.2012Terrain elevations in the development plan are incorrect.12
28.08.2013Separate land and generate building land? Where to inquire?14
14.11.2013Our floor plan of 120 sqm on a 469 sqm plot73
14.01.2014Plot on a slope; embankment - retaining - costs?10
09.04.2014Questions/neglected plot/meadow, determining construction measures44
24.03.2014Buy property - demolish old building - build new?!?12
24.07.2014Buy public parking lot next to the property17
26.02.2015Floor plan house / property28
05.04.2015Property reserved. Financing is pending52
10.04.2015Cost estimate architect single-family house. Your assessment44
19.01.2018Clearing and preparation of land12
17.08.2015Expand property11
11.09.2015Building a garage on the boundary is not possible according to the architect.11
06.09.2016New development area - slope on the property10
16.11.2016Broadband supply for the new development area over my property17
01.02.2018What surveying costs apply to the property?16
25.11.2019New single-family house approx. 174 m² floor plan architect55
02.06.2020New development area - Plot from the municipality18
17.09.2024New development area - sloping plot19
28.09.2024Architect commissions surveyor without the homeowner's consent.45

Oben