SSteffenBank 2017-03-06 05:18:56#1If the weather allows it this afternoon, I will start with our driveway. 16x6m. The plan is to have the curbstones set within the next 14 days.
If the weather allows it this afternoon, I will start with our driveway. 16x6m. The plan is to have the curbstones set within the next 14 days.
JJudyyy 2017-03-22 14:39:54#2Hello, I also have a question about paving or the preparation. Our house needs to be filled about ~ 50 cm above the existing ground level. Do I also have to remove the topsoil (30-50 cm) for the access path or can I create the base layer on top of it? Best regards Judyyy
Hello, I also have a question about paving or the preparation. Our house needs to be filled about ~ 50 cm above the existing ground level. Do I also have to remove the topsoil (30-50 cm) for the access path or can I create the base layer on top of it? Best regards Judyyy
JJudyyy 2017-03-22 18:54:41#4Yes, that is what I feared. Great, then I have >130m³ to fill. Thank you for your answer. Regards Judyyy
Yes, that is what I feared. Great, then I have >130m³ to fill. Thank you for your answer. Regards Judyyy
Ttomtom79 2017-03-22 19:18:59#5Best to use recycling material for that, otherwise it will get damn expensive.
JJudyyy 2017-03-22 21:35:23#6At about 90 cm build-up height, I could fill the first 50 cm with filler soil/filler gravel sand, right? That costs at least half. Regards Judyyy
At about 90 cm build-up height, I could fill the first 50 cm with filler soil/filler gravel sand, right? That costs at least half. Regards Judyyy