What do you do about surface water to ensure it stays on the area even during heavy rain?
How do you secure the slope?
The area is not sealed. The crest of the slope is slightly raised so that no water can overflow the crest. It is not secured at all. It is interlocked according to ZTV E-Steuerberater and overbuilt by 1m during construction, compacted, then reconstructed to the required slope and subsequently planted.
I positioned the house this way to have a clear view of the field to the rear. To the south, there is a green strip with corresponding planting/forest as specified in the development plan. Hence, the living space including the terrace is oriented towards the west.