i_b_n_a_n
2023-08-30 20:32:04
- #1
Then you don’t have to comply with the BKW limits either, because a BKW also expands the existing system and therefore you can equip your 5 possible modules with a suitable inverter or string inverter and then simply report an extension for your current system.
Isn’t there a deadline (2 years) within which the system expansion must be reported in order to qualify for the same feed-in tariff? Also, a suitable electrician would have to be involved (one authorized by the grid operator – right?)
The system went into operation in September or October 2021.