anat79
2018-10-03 18:47:41
- #1
Hello everyone,
we are building in the second row, actually there is a 3m wide construction road leading to our house (which will later be a private road providing access to the property). We wanted to start the interior plastering at the end of October. Now, for the house construction in the first row, the basement was excavated and surprisingly the construction road was narrowed to 1.4m. Until the basement is backfilled, which will probably take at least until the end of November. Therefore, the question would be whether or what possibilities exist for the plasterer to still work with us. The path is 20 meters long and there would be space for the silo at the front house. We have an appointment at the end of the week with our architect and the planned plasterer and it would be great to have an idea beforehand whether or what could be possible.
Thank you all!
we are building in the second row, actually there is a 3m wide construction road leading to our house (which will later be a private road providing access to the property). We wanted to start the interior plastering at the end of October. Now, for the house construction in the first row, the basement was excavated and surprisingly the construction road was narrowed to 1.4m. Until the basement is backfilled, which will probably take at least until the end of November. Therefore, the question would be whether or what possibilities exist for the plasterer to still work with us. The path is 20 meters long and there would be space for the silo at the front house. We have an appointment at the end of the week with our architect and the planned plasterer and it would be great to have an idea beforehand whether or what could be possible.
Thank you all!