House construction schedule including subsidies (KFW, L-Bank) sensibly

  • Erstellt am 2023-07-25 10:51:33

11ant

2023-07-25 18:08:46
  • #1

I'm currently unsure whether the OP might have already read my house building schedule (but only partially understood it or took the remark that you can also proceed differently the wrong way):

On the one hand, I read with satisfaction that someone wants to commission "Module A" and start a preliminary request for offers with its results (and even open to building methods!). That sounds wise so far. Less wise seems to me deferring the clarification of "rock or swamp" to after Module A with the architect instead of before. And I miss how the planning should continue because phase 3 is definitely recommended to be done with (the same?) architect. And it has not yet become clear to me what can still call the funding eligibility into question if the builders themselves are positively confirmed suitable (?)



If I understand correctly, the municipality has so far only allocated the building plots mentally without the parcels having already been surveyed. Regarding the question of whether the earthworks and shell construction lots should be awarded separately, I would not preempt the architect. The result of the preliminary design is fundamentally NOT suitable for concrete request for offers but only for rough determination of whether the specific building project will be significantly better or cheaper realized in wooden or stone construction. The result of this request round does not always immediately lead to a decision — neither whether wooden or stone, nor whether this particular general contractor or award decision only after tender.

At one extreme (general contractor and wood), the architect only does phase 3 after the resting period, and the GC takes over. At the other extreme (stone and award decision after tender), the architect does the complete "Module B" (and subsequently also C).


That sounds reasonable ...

... that, on the other hand, less so. I suspect the end of parental leave is the reason for the waiting as well as the tipping point in the financing — insofar the waiting is relatively understandable. Absolutely seen, waiting is strategically not a smart idea. What would be the consequence of building with income during parental leave and/or without factoring in the subsidy: thirty square meters less? — or for a while only paved parking strips instead of a double garage?

I would not artificially delay building with manageable compromises; the move-in will happen only when K1 can already walk and K2 is potty-trained. After bark beetles, corona, and Putin, new adversities will appear to blow away the hope for cheaper building. My motto "build now" does not come from nowhere.
 

11ant

2023-07-25 18:20:51
  • #2
And basically, you already suspect this yourself, as the name @Let´sBau24 already says: not ~26.
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
19.03.2013Turnkey or build with architects?19
21.07.2013Cost estimates from two architects differ greatly!10
13.11.2013Do you absolutely need an architect?10
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
21.08.2014Construction costs when building with architects. What does your experience say?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
12.10.2017Cost of enclosed space. First draft discussed with architects27
11.07.2018Architects / Civil Engineer Service, Execution Plan, Scope26
29.01.2019Responsibility of the architect in case of KfW interest and further matters148
28.02.2019HOAI or why architects have no interest.....38
26.04.2020Are phases 1-4 sufficient? Or additionally 5?11
01.07.2020Complete offer from the architect? Is the price reasonable?54
06.01.2022Architects or prefab house cost calculation and next steps27
22.05.2022Are performance phases 1-3 with the architect and lump sum offer somehow disadvantageous?19
18.01.2023Architect performance phase 1-4 - Which documents are required?33
25.06.2022Is the cost estimation by the architect realistic?39
12.02.2024Preliminary design via the architect and then tendering?16
13.11.2023Catalog house or free planning with architects12

Oben