the costs were secondary for us, the process was more important, 1 pillar for everything, dig once in the walking-driving easement
 

Tolentino

2020-09-17 14:12:46
  • #2
Funny, I am currently in Lichtenberg (Rummelsburg). Building land for single-family houses is no longer affordable here, if you could even find any, I think you will be further north, right? Building land for me is then in Kaulsdorf. There is no external column there now. I thought I could save myself the additional construction power connection with the column. But if that is not really useful, I prefer to go directly into the house later... Funny, I was told that you cannot use one column for two houses. I almost think we are talking about different columns. Is yours on one of the supplied properties or in front of it?
 

Nida35a

2020-09-17 14:20:21
  • #3
Yes, northwards, the plots are filling up here and the grandchildren of the last [Laubenpieper] are already dreaming of a house or a Porsche
 

Tolentino

2020-09-17 15:05:31
  • #4
So, I have now received an answer from the electrician of the GÜ. He says he can connect his construction power box with meter directly to the column and I only need to sign a construction power supply contract. A separate construction power connection from the network operator is then no longer necessary. Later, when the house is sufficiently finished, the construction power distribution box will be disconnected and the cable will be connected in the utility room. Then I can also conclude a normal household power supply contract. By the way, he advised me against buying a used construction power box myself, because you never know if it will function properly. With a monthly rent of 50 EUR, it is something to consider. I think my father-in-law, who preferred not to do the connection himself even though he can (due to liability reasons in case of damage), could at least check such a box... What do you think?
 

Nida35a

2020-09-17 15:15:49
  • #5
then it is like with us, and it works that way too. The electrician rerouted the cable 5x50mm2 in February, sweating profusely
 

Tolentino

2020-09-17 15:25:57
  • #6
Yes, but I don't need two applications. I only apply for the pillar once (already done) and do not need to separately apply again for a construction power connection. That is what I meant all along.
 

Similar topics
02.01.2015No construction power box, take electricity from the neighbor18
16.07.2015Cable for outdoor lamp too short11
19.02.2017How bad is the condition of our building ground?23
16.11.2017No building land due to new EU native model?168
01.02.2018Build an affordable prefab house on expensive building land17
10.12.2019Building ground suddenly a biotope135
20.02.2020What does the electrician do during the shell construction phase?19
04.02.2020Installation of additional insulation for underfloor heating - cables lie on the raw floor slab25
07.09.2021Wi-Fi New Construction - Network Sockets/Cables53
09.02.2020Loess Loam & Shell Limestone as Building Ground: Unexpected Expenses / Costs10
01.09.2020Which conduit for LAN cable?32
18.09.2020CAT cable in the utility room - not crimped?45
21.07.2021Problem with the electrician - what would you do?78
08.05.2021Connecting LED ceiling lamp - several cables hanging from the ceiling27
04.01.2022How to distribute and connect SAT cable and Ethernet?16
28.11.2022Do you need LAN cables in the garage?107
20.09.20225-pin cable to 3-pin cable13
08.10.2022Requirements for construction power box Construction power distributor12
09.07.2023Electrician Cost Estimate - New Installation22

Oben