Hi, I have looked into it again and wanted to ask you if everything is correct. The goal is to prepare the ceiling and walls for the decorative quartz. The joints of the filigree ceiling will be closed by the general contractor. I have read the following procedure:
1. Remove all unevenness from the ceiling once
2. Prime the ceiling (sto prim)
3. Apply Knauf Multifinish
4. Smooth the ceiling
5. Sand
6. Repeat steps 3-5 three to five times
7. Paint
Basically the same for the walls. Did I forget anything?
Thank you very much