Bauthaler
2021-05-17 20:15:48
- #1
That was offered by a prefab house company. It was a similar house, same shape but with a different interior layout, straight staircase. But also external exit, hipped roof, etc. Of course, we don’t know that for sure. Especially since the 600,000 included a basement apartment that doesn’t work in the current floor plan.What exactly should be included in these costs? And who estimated that, if there wasn’t even a finalized design yet?