That can be done like this
I don't understand everything about it.
What don’t you understand about the development plan? You can ask specific questions.
I think going to an architect is necessary. How much should one budget? €6-7k? Or is a “first sketch cheaper”?
If you want to build with a general contractor (GC), then you don’t need a separate architect, since that is included with the GC.
Yes, an employed architect won’t be able to design you an exclusive house now, but that is neither wanted nor possible here.
Ultimately, it can be noted that this is a standard plot with a standard development plan. A standard design is planned on it (just as you have sketched it).
You look for an architect if you have problems or want something more individual, and also if you want to build with individual or own trades.
That is not necessary here.
However, I warn against (this was always mentioned here by ) letting a semi-detached house best be built together by one GC. Although you don’t save much on additional construction costs, a few thousand euros for joint trips, container, and scaffolding orders are already saved. What you save on are construction defects at the joint and strange annex structures when one starts earlier than the other. Even a GC semi-detached house half can be planned individually inside.
Therefore: sit down with the neighbor and agree on the GC.
Inside you can then have individual planning done.