I have never read that before, tell me (careful, without link!), where the development plan can be found ("Kleinkrotzenburg Nr. 123 Am Blocksberg").
Then the wish-size-budget gap still needs to be closed. How is your slope description to be understood: flat up to 3m past the street boundary line, then (how steeply) falling? (what is important is especially how the height variation is directly beneath the house footprint). With any significant slope, there is a risk with all providers that they put a flat lot design on top of a basement like on a jack without using the slope. This regularly creates excess surface. Unfortunately, you have not yet shown which design you requested.
My impression was/is frankly rather that the lack of clarification was thoroughly overcompensated by incorrect assumptions. That is where we can best work together. We are happy to help, but (since we have been missing ) only have cloudy crystal balls left. Therefore, there is a power-locking connection between scant information and limited helpfulness.
Hello 11ant, I am now attaching screenshots of the development plan here. The legally binding development plans
of the Lautertal municipality can be found in the
Bürger GIS of the Bergstraße district. The address is Nibelungenstrasse 133 in Elmshausen.
I think the issue with determining the ridge and eave height is that the basement would be freestanding towards the back due to the slope and therefore counts. Attached are 2 pictures of the plot so you can assess the slope. We would like to build at street level like the neighbors on the right, who chose the variant of a basement with a white bathtub and a timber-frame house and then had problems because of the 7m eave height and had to adjust their plans.
We have already spoken to a civil engineer and excavator, and he estimated the effort for connection costs, basement excavation, and filling up to street level and driveway paving comparable to the neighbors at about €100,000. For that, however, we would also get the plot at a fair price.
We are currently in the final negotiations for the plot purchase, and all we have really done so far is try to understand what it means financially to implement something according to our ideas on this plot.
Thank you and best regards
KPP