apokolok
2021-02-02 21:52:52
- #1
With us, the developer charged an extra €6250 for 10 windows for the electric shutters - with 2* manual opening options for emergency exit, without central control (I will convert it myself later with Shellys or something)
A good example of why developer / general contractor contracts, in my opinion, have a worse price/performance ratio than building with architects. The price is an absolute outrage, the material probably costs 1/10 of the quoted price. Then you still have to lay 10 cables and install switches...