Controlled residential ventilation: positioning of supply and exhaust air in my designs

  • Erstellt am 2020-10-12 00:03:53

Shiny86

2020-10-15 16:13:20
  • #1


Ok, good. Then it really isn't because of me, since I don't determine the diameters. But we had it moved in the living room by about 3m rather than just 1m.

Is the planning done by the architect or does it come from the equipment manufacturer?
 

Mycraft

2020-10-15 16:43:58
  • #2
The architect only has limited knowledge there. Actually, something like that is done by an MEP planner. Whether they are from the manufacturer, the general contractor, the architect, or somewhere else entirely is not really significant.
 

Shiny86

2020-10-15 17:09:59
  • #3
Ah ok. Our architect is at least moving the valves for us. But it's good if you can't really do much wrong there...
 

Similar topics
19.07.2018Draw the plan yourself? Do you necessarily need an architect?11
18.02.2011Architect totally messed up - experiences?17
30.09.2012Final invoice architect13
27.10.2013Architect --> Agreements? What is that?21
16.04.2014Cost of soil survey - Does the architect pay or do we?12
16.09.2014Termination of collaboration with architect - demands excessive fee28
01.10.2014Collaboration with an architect - how does it work properly?22
25.02.2015Planning / Architect, involvement of specialist planners for the approval plan10
10.04.2015Cost estimate architect single-family house. Your assessment44
26.04.2015Semi-detached house architect or general contractor / prefabricated house or solid construction13
27.12.2015Who has built with an architect? Experiences??85
11.09.2015Building a garage on the boundary is not possible according to the architect.11
17.11.2015Is an architect really that expensive?46
05.04.2020Developer or architect - costs43
07.03.2016Various dimensions architect execution drawing12
23.09.2016Architect and budget limit... insurance? possibilities25
17.04.2017Civil Engineer vs. Architect17
13.06.2017Architect or developer? Which is more affordable?13
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
10.11.2017House plan by architect 2 floors with basement18

Oben