More like EUR 40-50k, depending on the house size as a pure utility basement.
Current estimated costs:
Single-family house 190 sqm: EUR 290k - as a monolithic KfW 70 efficiency house with gas condensing boiler and solar domestic hot water heating, decentralized ventilation system
Incidental construction costs: EUR 40k
Basement: EUR 40-50k
Prefabricated garage EUR 12k including electric sectional door and electrification of the prefabricated garage
Outdoor facilities EUR 15,000
Interior finishing: EUR 25,000
Kitchen: EUR 10,000
Buffer: EUR 25k
Surveyor/construction supervision: EUR 5k, depending on scope possibly more
Total investment approx. EUR 472k
Now it should be roughly realistic
Regards from the Rhineland
Additionally, another 15% of the construction costs as incidental construction costs (including house connections, planning costs, building application, architect services, soil survey, excavation of the foundation pit and removal).
Take a look here:
https://www.hausbau-forum.de/ratgeber/bauherrenhilfe.422/bauherrenhilfe-vor-vertragsabschluss.424/bausumme.662/#Baunebenkosten%20und%20Grunderwerbsteuer
In addition, there is the basement (35,000-40,000 EUR not a residential basement)
More like EUR 40-50k, depending on the house size as a pure utility basement.
Current estimated costs:
Single-family house 190 sqm: EUR 290k - as a monolithic KfW 70 efficiency house with gas condensing boiler and solar domestic hot water heating, decentralized ventilation system
Incidental construction costs: EUR 40k
Basement: EUR 40-50k
Prefabricated garage EUR 12k including electric sectional door and electrification of the prefabricated garage
Outdoor facilities EUR 15,000
Interior finishing: EUR 25,000
Kitchen: EUR 10,000
Buffer: EUR 25k
Surveyor/construction supervision: EUR 5k, depending on scope possibly more
Total investment approx. EUR 472k
What do you think of this breakdown, does it reflect a realistic picture of the expected costs?
Now it should be roughly realistic
Regards from the Rhineland