BAFA funding for air-water heat pumps in new construction - how does it work?

  • Erstellt am 2017-09-20 12:17:44

ares83

2017-09-21 09:31:39
  • #1
Please read carefully! The page is a bit confusing. The application you mentioned is for basic funding, which only applies to existing buildings. In new construction, there is only the innovation funding and its conditions.
 

G-Star1988

2017-09-21 09:32:50
  • #2
ok so I don't get any funding with my Rotex HPSU compact 508 with 8 KW?
 

ares83

2017-09-21 09:35:01
  • #3
If you have already ordered or even installed anything, then no.
 

HAL06120

2017-09-21 09:35:12
  • #4
There are standards for the calculation of the annual performance factor. In theory, one can adjust the values to achieve a better annual performance factor and say one wants 25° supply temperature and 18° room heat, etc., but whether and what is ultimately accepted is rather a matter of chance. However, the fact is that the subsidy is probably not reclaimed if the annual performance factor is not achieved in practice.
 

ares83

2017-09-21 09:43:12
  • #5


It can be done, but that was not the case for us. As far as I understand, it is about the fact that, for example, the HRV factor through the controlled residential ventilation part is not included in the calculations.
 

G-Star1988

2017-09-21 09:44:11
  • #6


Well, the shell is almost completed with the developer and the Rotex also comes from the developer, so it is actually too late.

I played around with the annual performance factor calculator on the Rotex homepage. I can't get to 4.5 no matter how I turn it. So it's settled anyway. Thank you very much
 

Similar topics
07.10.2016Which heating is recommended for KfW 55?58
25.10.2015Which heating system? Air heat pump / Gas / Geothermal52
19.06.2015Build according to KFW 70 or the Energy Saving Ordinance 201442
19.05.2021Experiences with brine heat pump491
06.12.2015Heat pump / final energy demand / annual performance factor20
24.12.2015Single-family house, Energy Saving Ordinance 2016, developer recommends additional insulation - is it sensible?39
15.06.2016Bafa: Renewable Energy Heat Pumps with Test Certification32
07.10.2016BAFA funding tips38
24.02.2017LWW, gas or geothermal operating cost experiences35
07.12.2017Costs for geothermal drilling - Is it worthwhile in our case?32
20.01.2020New BAFA funding - Air-to-water heat pump with solar thermal39
24.01.2020Annual performance factor calculation for funding (parameters and calculation tool)29
13.01.2021Comparison of geothermal heat pump with LWW pump86
13.09.2020BAFA funding for heat pump (air-to-water heat pump) when building with a developer25
14.10.2020BU withholds "confirmation of the builder" for BAFA funding21
14.02.2024Bafa funding for heat pumps will be discontinued as of 31.12.2020.508
20.04.2021BAFA funding depends on the form "Confirmation of the Developer"20
24.01.2022BEG funding for Efficiency House 55 in new construction will be discontinued66
14.06.2022KfW BEG funding stopped 261, 262, 263, 264, 461, 463, 4641239