Keeper21
2021-04-19 14:39:53
- #1
I doubt that DFH will issue me a separate invoice just for the air-water heat pump, but I can give it a try. However, I see the problem more in that I stated that I carried out the measure not on my own but with DFH. And I can no longer change that. That choice was possible when confirming the implementation after completion of the measure.I can understand the BU not wanting to fill out a "developer" confirmation if it is not a developer. After all, their input tax deduction entitlement depends on it. If the HSL subcontractor of my general contractor hadn't dropped out, I would have had my general contractor issue a separate invoice only for the relevant items (heat pump, possibly ventilation) and then fill out and sign (stamp) the specialist contractor declaration. In my opinion, that is the correct procedure.