T21150
2016-03-21 20:23:03
- #1
Today, 21.03.16, it continued.
The day began with the question: Where is the inverter? Supposedly, it should have been with me since Thursday. A misunderstanding, as it turned out. The device was and still is initially not available. The shipping company failed to communicate this fact.
Well – strength lies in calmness, I am still far too sick to get upset about something like that. There are more important things. The metal box will come eventually, I actually have really other problems.
The string and AC-UV were done, the main distribution box prepared so far.
The installers were still young men, less experienced. They messed up the first drilling for the strings from the bathroom (behind the knee wall) down into the utility room. The hole is somewhere (in the wall insulation, was sealed again afterward, good that I am sick, otherwise I would have sealed it myself (meaning tantrums), so I was simply quite calm).
Despite all explanations, it went wrong, I can hardly walk, one could have gotten angry. Well – until January I would always have stood beside it, but that was and is not possible now and trust on construction sites always fails. You always have to be there yourself for important trades.
Drilling #2 also seemed not to work. But I specified drilling #2. It had to work and be correct. I know my house, all the measurements, every square millimeter of the building, I helped build it.
I then asked the young guys to get a flexible probe from the car and found out: You really have to drill through the screed in the upper floor so that a hole for the strings is created – drilling even more holes, like the two planned (string cables next to boiler-solar cables, screech), would have gotten me out of my calmness after all.
Now I am waiting to see when the rest will be installed. I don’t really care about the topic right now – it is more important to me that I function again in the foreseeable time (months), the solar/photovoltaic system can wait.
Thorsten
The day began with the question: Where is the inverter? Supposedly, it should have been with me since Thursday. A misunderstanding, as it turned out. The device was and still is initially not available. The shipping company failed to communicate this fact.
Well – strength lies in calmness, I am still far too sick to get upset about something like that. There are more important things. The metal box will come eventually, I actually have really other problems.
The string and AC-UV were done, the main distribution box prepared so far.
The installers were still young men, less experienced. They messed up the first drilling for the strings from the bathroom (behind the knee wall) down into the utility room. The hole is somewhere (in the wall insulation, was sealed again afterward, good that I am sick, otherwise I would have sealed it myself (meaning tantrums), so I was simply quite calm).
Despite all explanations, it went wrong, I can hardly walk, one could have gotten angry. Well – until January I would always have stood beside it, but that was and is not possible now and trust on construction sites always fails. You always have to be there yourself for important trades.
Drilling #2 also seemed not to work. But I specified drilling #2. It had to work and be correct. I know my house, all the measurements, every square millimeter of the building, I helped build it.
I then asked the young guys to get a flexible probe from the car and found out: You really have to drill through the screed in the upper floor so that a hole for the strings is created – drilling even more holes, like the two planned (string cables next to boiler-solar cables, screech), would have gotten me out of my calmness after all.
Now I am waiting to see when the rest will be installed. I don’t really care about the topic right now – it is more important to me that I function again in the foreseeable time (months), the solar/photovoltaic system can wait.
Thorsten