I would be interested in that too! What was the compromise then?
 

borderpuschl

2019-10-11 09:09:05
  • #2
Starting with the wall construction which already led to failures, through the heating concept which most still agreed with. The main sticking point was on the one hand a slanted gallery (structural problems which could not or would not be solved by the prefab house manufacturers) and a partial wooden facade which was supposed to/must be flush with the plaster.
 

hampshire

2019-10-11 10:37:20
  • #3
Prefabricated house providers have - and this makes sense - a limited portfolio - here are a few points that led us not to build with a prefabricated house provider: limited heating concepts such as masonry heater as main heating limited selection of interior wall surfaces e.g. clay plaster with straw content limited switch programs e.g. no Gi Gambarelli limited wood selection e.g. no hewn wood as exposed beam layer limited implementation of foundations and floor slabs e.g. on 27-degree slope limited tile selection e.g. no Sicis glass mosaic limited window selection e.g. no Solarlux no photovoltaic solar tiles no wooden acoustic ceiling ...
 

haydee

2019-10-11 11:56:46
  • #4
The small GUs without a sample center are better off, or else directly with an architect. The small ones call Maier and ask if he has ever heard of photovoltaic solar tiles and can install them. Then they ask Hubert if he can get the tiles from the wholesaler, etc. Although I don’t trust every architect to implement Hampshire’s wishes. Some big ones dismissed our hillside location from the start. They don’t have anything as shallow as 27°. For us, behind the house, it’s between 40° and 44°.
 

Luftpumpe

2019-10-11 12:26:46
  • #5
Do you have them on the roof now? I basically also find it unnecessary to cover a roof with roof tiles and then also with solar modules and would prefer a simple and durable solution with solar modules. As far as I have read, there is no German manufacturer anymore who bothers with solar tiles. The multitude of connection points and contacts are potential sources of malfunction and have not proven themselves. Too much effort, too expensive, too many complaints... if you want something nice, you can go for in-roof modules, otherwise currently only the standard solar module as an on-roof module remains. Or are there other concepts by now? I would like to see that when it's finished! How do you come up with such an idea?
 

guckuck2

2019-10-11 15:13:34
  • #6


None of what Hampshire has listed is within the architect's skills.
He only has to procure the trades that can deliver these special requests. Or the materials are procured separately and a craftsman is found who installs them if he cannot procure them himself.

The architect gets work with special wall constructions combined with things like flush wood/plaster facades, combined with structural challenges. Just as borderpuschl wishes.
 

Similar topics
05.03.2010Passive house, heating combination with solar, energy recovery, photovoltaics?38
26.10.2013Planning/Architect, possible execution by "prefabricated house providers"21
08.09.2015Massive house by the architect, approximate costs?16
05.05.2016Insulate the roof: flakes, panels or wool17
28.05.2017Floor plan single-family house / hillside location within town23
20.10.2017Roof with photovoltaic or other investment, any experiences?19
27.06.2018Prefabricated house provider with electrical installation as own work14
24.11.2019Fuel cell or operating costs, photovoltaics and solar thermal?21
24.06.2019Ventilation bricks cause problems regarding photovoltaics - any experiences?11
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
02.11.2019Assess slope45
10.05.2020New construction DH, hillside location in Hessen - feedback on the floor plan38
01.07.2020Complete offer from the architect? Is the price reasonable?54
23.05.2021General contractor / prefabricated house provider with an existing BG (HOAI Phase 4)27
20.05.2021Tendering individual trades by architects: expensive?16
06.01.2022Architects or prefab house cost calculation and next steps27
27.10.2021Photovoltaic system 120 sqm living area - cover the entire roof?45
25.06.2022Is the cost estimation by the architect realistic?39
12.12.2022Floor plan and elevations for a single-family house of approximately 160 m² on a hillside location74
02.07.2024Development according to §34 - Large house with steep roof required11

Oben