parcus
2009-10-29 13:32:38
- #1
Solar energy is used for hot water in conjunction with a large buffer.
-that only works in the corresponding season, saving between 100 to 200 euros per year, no more.
Component activation is essential here.
What is recommended for additional sources?
-dv heat pump, but only a small one, since it is only an auxiliary heater.
-Pellets are too expensive and increasingly uneconomical, already more expensive than gas/oil this year again.
And I thought I’d put a few more photovoltaic panels on the roof to save even more and thus minimize the energy costs of the electrical devices and fan motors of the comfort ventilation, etc...
-that is not economical at all, since you currently get more for the kWh than you pay. It’s also not a good investment.
Covering the electricity for the heating register with photovoltaics is nothing but burning money.
A statement about the costs can only be made when the parameters are known. So size, equipment,...
Your father as construction manager is certainly good, since he will possibly be permanently on site. I would involve him right away.
But your father does not seem to me to be up to date with the latest technology, otherwise you probably wouldn’t have these questions.
Best regards
-that only works in the corresponding season, saving between 100 to 200 euros per year, no more.
Component activation is essential here.
What is recommended for additional sources?
-dv heat pump, but only a small one, since it is only an auxiliary heater.
-Pellets are too expensive and increasingly uneconomical, already more expensive than gas/oil this year again.
And I thought I’d put a few more photovoltaic panels on the roof to save even more and thus minimize the energy costs of the electrical devices and fan motors of the comfort ventilation, etc...
-that is not economical at all, since you currently get more for the kWh than you pay. It’s also not a good investment.
Covering the electricity for the heating register with photovoltaics is nothing but burning money.
A statement about the costs can only be made when the parameters are known. So size, equipment,...
Your father as construction manager is certainly good, since he will possibly be permanently on site. I would involve him right away.
But your father does not seem to me to be up to date with the latest technology, otherwise you probably wouldn’t have these questions.
Best regards