Even female experts can become pregnant, and then sometimes at a specialist office someone answers the phone as a substitute who actually knows about something else.
 

Spike86

2020-10-29 17:00:29
  • #2


Yes, there is the inspection shaft (concrete), which is also accessible, and then another made of plastic, where the meter hangs on a rope/string. This one, in turn, is not accessible.
 

Spike86

2020-10-29 17:01:31
  • #3


Definitely, it was meant more out of desperation, calling there and still ending up clueless after the call.
 

Nida35a

2020-10-29 19:00:42
  • #4
All meters are located in the utility room,
No one feels like climbing into a shaft to read the meter,
The shaft is only for wastewater 1-3m from the property boundary
 

Similar topics
04.04.2016Heat pump on separate meter or together with household electricity20
02.04.2020Possible building plot - shaft on the property28
06.10.2021Photovoltaic system / heat pump, do you have 2 meters?55
14.06.2021Separate meter and electricity tariff for air-to-water heat pump sensible?103
03.07.2021Separate water meter for garden water - How to read the meter21
13.11.2021Requirements for ancillary apartment, wiring, meters, etc.13
25.05.2022Cover shaft 1.5 x 1.5 concrete like structure25
14.06.2023Heat pump and household electricity all through one meter25
25.09.2023The supplier has incorrect meter numbers in the system - what to do?42
31.10.2023Extra meter for heat flow tariff (heating electricity tariff) yes/no?36
28.05.2024Water in the shaft of the lifting system19
02.10.2024Photovoltaic - Position on the roof and only one meter?10
07.01.2025Is a heat pump meter sensible? According to the bill, yes, but is that correct?13

Oben