Solar panels not available - surcharge / cancellation possible?

  • Erstellt am 2020-07-17 12:49:05

Ben-man

2020-07-22 21:34:55
  • #1
The one with the best marketing department
 

kati1337

2020-07-22 21:51:40
  • #2
I found this today in the utility room:


So I assume the 2 meters were planned for us. Unfortunately, I can't reach anyone at the construction company or the electrician at the moment. They are all on company holiday. As soon as work resumes in early August, the meters are supposed to be installed immediately. So that the air-water heat pump can be put into operation afterward.
Therefore, I can't inquire any further about how exactly it is planned.
In the contract, I also found that we have an additional package for the heat pump and photovoltaics included, which states:
ISG web in connection with Sunny Homemanager and Smart Energymeter as an interface to the photovoltaic system including EMI software.

Can I deduce anything from this?
I'm now afraid that I can only use the photovoltaic power for the air-water heat pump and the rest will be fed into the grid. I definitely don't want that. The heat pump is estimated to consume maybe 2000-3000 kWh per year, hopefully even less. Our household electricity consumption was 6000 kWh in the last period. We can certainly reduce that in the new house, but we will probably still remain between 4-5k. Therefore, it is really important that it is wired in such a way that we can use the photovoltaic power for everything. I would rather do without the second meter for the air-water heat pump.
I don’t know if the tariff is worthwhile. I can’t calculate it either because too many parameters of the calculation are unclear to me.
 

Andre77

2020-07-22 23:17:20
  • #3
The meter cabinet will be the standard model. For example, I have 3 meter slots planned. One day when I was on the construction site, the electrician crew was just working. Normally, I would have had to order the second meter or the preparation separately from the general contractor for the heat pump. Of course, I did not. They probably would have done it anyway, but after I said there is only one meter, they did not do anything further. So you probably can't deduce anything from that.
 

Similar topics
08.06.2017Photovoltaic system, using experiences like a heat pump?64
04.04.2016Heat pump on separate meter or together with household electricity20
30.05.2016KfW55: Gas or air-water heat pump with/without photovoltaics17
21.06.2016Heat pump with photovoltaics vs gas and solar thermal52
10.07.2016Air-water heat pump with photovoltaics or pellet with solar25
03.01.2017Preparation for photovoltaic or solar thermal with air-water heat pump18
07.05.2020Collaboration of air-water heat pump, photovoltaic system and storage38
05.12.2020Gas with solar thermal? Or heat pump with photovoltaics? Consultation149
08.05.2020Heat pump + photovoltaic system with or without storage11
28.07.2020Photovoltaics and heat pump - meter confusion and cost issue12
06.10.2021Photovoltaic system / heat pump, do you have 2 meters?55
14.06.2021Separate meter and electricity tariff for air-to-water heat pump sensible?103
03.01.2022Electricity meter for heat pump in combination with BAFA and photovoltaic22
24.02.2022Photovoltaic system air-water heat pump - profitability single-family house KFW55EE95
25.03.2022Switching from gas to solar / photovoltaic with / without heat pump31
05.07.2022Renew old heating with heat pump or gas boiler and domestic hot water heat pump58
14.06.2023Heat pump and household electricity all through one meter25
22.03.2024Should photovoltaic design be considered with the heat pump or not?20
02.10.2024Photovoltaic - Position on the roof and only one meter?10
07.01.2025Is a heat pump meter sensible? According to the bill, yes, but is that correct?13

Oben