Share of trades in % of the total construction cost

  • Erstellt am 2017-09-19 22:28:55

11ant

2017-09-24 00:40:55
  • #1

Roofs, oh well
It is hardly possible to seriously and qualified respond to what to make of the price quotation :-(
 

Maria16

2017-09-24 08:06:37
  • #2
Who coordinates for you that the roof is installed on time and the insulation between the rafters or similar is done promptly/simultaneously? What do you understand by the 240 sqm? Living space or ground area times three? If the cistern is included: are all other ground works (excavation; laying of the underground pipes, to which the rainwater pipes then connect, etc.) included? Who coordinates that for you?

For comparison: we received offers of about 200,000 (+/- about 5,000) each for a ground area of approx. 9.6x12 m, basement/ ground floor/ upper floor/ attic for all earthworks, shell construction with chimney and concrete stairs including roof structure, including prefabricated garage and carport. (whether you can really compare that now, I leave up to you ). The offers did NOT include structural engineering and architectural services, but due to the "extended shell construction" we had the advantage that the main provider (shell constructor) coordinated the earthworker and carpenter for us. Separate awarding of these three trades would probably have been a bit cheaper, but also significantly more potential for errors in the process and considerably more time expenditure for us.

My conclusion: -> get one or two more offers with the same scope of services -> such an extended shell construction including roof also has advantages
 

_Nerz_

2017-09-26 22:38:27
  • #3
Earthworks and sewer works are included. I wanted to obtain comparative offers anyway.
 

Similar topics
14.11.2011Shell construction still this year15
05.09.2015Cracks in masonry (shell construction)14
13.02.2014Mold on wood/ shell construction, is it possible to deduct the advance payment invoice?28
24.04.2015Buy tiles during shell construction24
09.03.2015Received an offer from a builder: Cost of shell construction - experiences?26
27.02.2015Purchase shell construction and complete it including financing15
11.02.2016Cost per cubic meter of built-up shell space14
07.05.2016Buying a shell construction - Experiences21
03.10.2016Single-family house, hillside location, basement half residential/useful area - expensive shell construction?15
20.04.2017Payment plan with 35% after the shell construction, okay?10
05.05.2017Rough construction flat-rate offer - forgotten necessary items11
06.09.2017Add a wind catch later to the shell construction17
07.10.2017From when must the shell construction be dry or sealed?16
18.12.2017Offers for single-family house shell construction and basement received - your assessment?21
31.01.2022Possible savings in self-performed structural work37
14.07.2019Costs for the shell construction of an office building16
27.10.2019Water in the inner frame: Shoddy construction? (Shell construction)15
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
28.05.2020Buy a 25-year-old shell structure42
28.03.2024Offer for shell construction of a single-family house 170 sqm - Is the price market-appropriate?57

Oben