Rohbauer has moved the windows by 10 cm

  • Erstellt am 2017-06-27 14:17:10

305er

2017-06-28 10:35:31
  • #1
Already now

So far there has only been one delay after another.
Actually, the roof should already be completely finished, according to plan.
But next Wednesday the ceiling is coming first.

The structural builder simply takes on too many orders and can't keep up, or doesn't get any materials delivered because there is a shortage everywhere
 

kaho674

2017-06-28 11:02:59
  • #2
Ahh, much ado about nothing.
 

Joedreck

2017-06-28 11:05:09
  • #3
And asking politely helps

Regards Joe
 

305er

2017-06-28 11:32:07
  • #4
Hey, I looked at the dumb plan 5 times
 

HilfeHilfe

2017-06-28 11:53:13
  • #5
we had 15 changes of the electrical plan

happened!
 

Curly

2017-06-28 12:08:57
  • #6
With us, the shell was constructed extremely precisely, sometimes even down to the millimeter. However, a WC door opening was built too large (because this door is smaller than the others). We pointed this out and the next day everything was corrected properly again. The bricks were removed and rebuilt, it was no problem at all. This can definitely be corrected and your ceiling hasn’t been installed yet either.

Best regards
Sabine
 

Similar topics
01.02.2017Basement originally partially concrete, now possibly completely brick-built28
17.03.2017Exterior walls built with a 4cm tilt31
24.06.2019Garage self-built, but which garage roof to choose?17
16.11.2020Large garage single-family house - prefabricated or brick-built?67
09.05.2021Interior walls made of drywall or masonry?18

Oben