Rohbauer has moved the windows by 10 cm

  • Erstellt am 2017-06-27 14:17:10

305er

2017-07-01 10:14:43
  • #1
The company with us, at the planning meeting/sample selection. But there were many changes, also in the bathroom and the kitchen, which is why we had to completely rethink everything. All because of seismic zone 1, which they should have actually known beforehand.
 

11ant

2017-07-01 14:35:03
  • #2
I would be interested in an explanation about that ...
 

305er

2017-07-09 22:14:38
  • #3
Hahaha
I did get the wall/window wrong.

But now they have really installed the interior walls incorrectly.
They are offset by 10 cm, which only really matters because it makes the guest bathroom even narrower than it already was.

Looking forward to what the site manager says tomorrow.
 

Curly

2017-07-10 09:59:36
  • #4
maybe that will still become clear. I can't imagine that the shell builders would measure so inaccurately, they also have plans and a tape measure.

Best regards
Sabine
 

HilfeHilfe

2017-07-10 10:01:58
  • #5
I would have the plans shown to me or point out to the site manager. Not that it is a preliminary version
 

305er

2017-07-10 10:19:44
  • #6
Well, one stone measured incorrectly, then maybe the reference point, and it already affects the rest
 

Similar topics
01.04.2020Construction Manager Area Neukirchen-Vluyn (Duisburg/Kleve/Wesel)10
10.02.2014Commitments from the construction manager - Trust relationship13
09.03.2014Construction manager missing10
04.07.2014First contact and presentation of our plans10
13.11.2017Construction scheduling - Who has to create it? General contractor, site manager?11
15.01.2018Can a construction manager resign due to poor performance?16
22.04.2018Construction is continuously delayed - call the site manager?36
31.05.2019The construction manager does not come, does not check, or he doesn't care about anything16
12.08.2019First appointment construction manager - Tips?11