What about architect fees, structural engineer, building application fees, earthworks, construction electricity, water, etc.? 5000€ additional costs are far too little. And beware! An architect-designed house does not have a fixed price; these are only estimates. It can become more expensive depending on how generously the architect has calculated.
 

ypg

2015-04-03 13:11:51
  • #2
Sorry, it reads as if all the construction-side costs are missing. Paving work, utility connections, permits, and surveying... Or did I overlook something?

I assume that the estimated costs from the architect regarding the building permit mean the building application? I mean... Why would the architect list these costs or is that normal?..
 

Effzeh

2015-04-03 13:18:03
  • #3
@ milkie Architect fees, structural engineer, building application fees, earthworks, etc. are already included in the above listing. Yes, since these are estimates, I also have a little "lingering gut feeling." However, acquaintances of ours have also built with him and had very good experiences. They were even able to save some money on their build!!
 

ypg

2015-04-03 13:18:15
  • #4
Is the access road that is included in the purchase already paved?
 

Effzeh

2015-04-03 13:19:21
  • #5
I don't think so.....
 

ypg

2015-04-03 13:20:17
  • #6
And where is this item, for example?
 

Similar topics
07.03.2014Earthworks are starting, but I need a tip.12
15.08.2016Civil engineer contradicts structural engineer27
28.08.2017Earthworks: Making the right choice of provider14
29.10.2018Earthworks in the construction performance description17
08.04.2019Earthworks costs in Bavaria15
08.09.2020Earthworks costs, hillside house14
11.02.2021Structural engineer needed for rough assessment of load-bearing capacity25
05.12.2021Cost of structural engineer single-family house23
23.07.2021Earthworks... Dispute with the occupational disability insurance20
27.11.2021Ancillary construction costs for earthworks according to soil report16
10.05.2022Carry out earthworks with equity capital?10
01.01.2023Structural engineer according to HOAI or flat rate offer?13
07.02.2025Cost issue for earthworks on a slope22

Oben