mtr1973
2019-09-14 12:15:55
- #1
Hello everyone!
We have been considering building for some time now and have Danwood on our radar for this purpose. Two weeks ago, we had a quote made by the DW consultant. It is a bungalow from the "Family" series, price starting at OK BP 97,000 euros, whereby interior doors, painting/plastering, and flooring must be provided by the customer, otherwise "turnkey". Of course, we were already aware in advance that the stated price is a "starting" price and that many additional costs would be added. However, after we got home with the offer in hand, we asked ourselves whether the price that ultimately came out is realistic at all, or - and my wife and I are really worried about this - if suddenly costs will appear everywhere after signing, which might even require additional financing. We definitely want to avoid that. For this reason, we would also retain an amount of 20,000 euros from our own capital as a "safety reserve" in the financing.
I would like to describe and list the offer here completely and hope that some of you might be able to say something about it. Especially with regard to whether this could be a complete offer at that price, or if individual works/materials might still be missing.
House: bungalow, 80m2, 22° roof pitch, 3 rooms, kitchen/bathroom/dryer on slab foundation. "Almost turnkey" except for the mentioned trades of flooring, plastering and painting of the drywall walls, and installation of interior doors. The materials for these are not included in the offer.
House price: 97,000 euros
Transport costs: 2,300 euros
Heating: standard gas boiler, 190l storage tank, 2 solar modules: 6,300 euros
Underfloor heating: 3,356 euros
Electrical and sanitary: standard without changes, 0 euros
Roller shutters on all windows: 2,982 euros
Water installation connection (incl. pressure reducer, water filter and meter installation): 890 euros
Roof drainage with downpipes without connection to sewer system incl.: 0 euros
Inner/outer window sills incl.: 0 euros
Floor hatch ladder incl.: 0 euros
Architect fees (DW architect, incl. building application and drainage plan): 5,990 euros
Foundation slab (90m2 incl. house connections): 12,760 euros
Outdoor facilities (proposal by DW for planning): 10,000 euros
Additional construction costs: (estimated by DW) 29,000 euros
The total price of the house (without outdoor facilities and additional costs) thus amounts to approx. 131,000 euros according to the offer. The additional costs are of course only an estimate, depending on soil class and other conditions this can of course change somewhat. If desired, I can also list the additional costs, there are about 20 positions with cost (estimates) indicated. It ranges from earthworks to the gas tank to the construction site toilet. Included in the list but not priced are: disposal costs, crane site, construction site setup.
So, and now the big question: is this a realistic and/or complete offer? Can you actually build a house for that money? Or are there still various items missing? Of course, it will not be a high-end house, we are aware of that. Simple equipment, simple materials, we would be satisfied as long as it is not rubbish that breaks after three years. Family planning is long since completed, the space would be completely sufficient for us (and for old age).
I would be happy if you could tell me something about it! If further information is needed, I can try to provide it.
Regards
We have been considering building for some time now and have Danwood on our radar for this purpose. Two weeks ago, we had a quote made by the DW consultant. It is a bungalow from the "Family" series, price starting at OK BP 97,000 euros, whereby interior doors, painting/plastering, and flooring must be provided by the customer, otherwise "turnkey". Of course, we were already aware in advance that the stated price is a "starting" price and that many additional costs would be added. However, after we got home with the offer in hand, we asked ourselves whether the price that ultimately came out is realistic at all, or - and my wife and I are really worried about this - if suddenly costs will appear everywhere after signing, which might even require additional financing. We definitely want to avoid that. For this reason, we would also retain an amount of 20,000 euros from our own capital as a "safety reserve" in the financing.
I would like to describe and list the offer here completely and hope that some of you might be able to say something about it. Especially with regard to whether this could be a complete offer at that price, or if individual works/materials might still be missing.
House: bungalow, 80m2, 22° roof pitch, 3 rooms, kitchen/bathroom/dryer on slab foundation. "Almost turnkey" except for the mentioned trades of flooring, plastering and painting of the drywall walls, and installation of interior doors. The materials for these are not included in the offer.
House price: 97,000 euros
Transport costs: 2,300 euros
Heating: standard gas boiler, 190l storage tank, 2 solar modules: 6,300 euros
Underfloor heating: 3,356 euros
Electrical and sanitary: standard without changes, 0 euros
Roller shutters on all windows: 2,982 euros
Water installation connection (incl. pressure reducer, water filter and meter installation): 890 euros
Roof drainage with downpipes without connection to sewer system incl.: 0 euros
Inner/outer window sills incl.: 0 euros
Floor hatch ladder incl.: 0 euros
Architect fees (DW architect, incl. building application and drainage plan): 5,990 euros
Foundation slab (90m2 incl. house connections): 12,760 euros
Outdoor facilities (proposal by DW for planning): 10,000 euros
Additional construction costs: (estimated by DW) 29,000 euros
The total price of the house (without outdoor facilities and additional costs) thus amounts to approx. 131,000 euros according to the offer. The additional costs are of course only an estimate, depending on soil class and other conditions this can of course change somewhat. If desired, I can also list the additional costs, there are about 20 positions with cost (estimates) indicated. It ranges from earthworks to the gas tank to the construction site toilet. Included in the list but not priced are: disposal costs, crane site, construction site setup.
So, and now the big question: is this a realistic and/or complete offer? Can you actually build a house for that money? Or are there still various items missing? Of course, it will not be a high-end house, we are aware of that. Simple equipment, simple materials, we would be satisfied as long as it is not rubbish that breaks after three years. Family planning is long since completed, the space would be completely sufficient for us (and for old age).
I would be happy if you could tell me something about it! If further information is needed, I can try to provide it.
Regards