You would probably have been on the safe side if the contract referred to the installation instructions of the manufacturer ([gibts auch im Netz]) and a corresponding mixing of the stones was carried out.
It looks exactly as described: always one layer from one pallet and then one layer from the next pallet...
I wish you a lot of patience, time, and nerves if you want to have this corrected cost-effectively.
Maybe someone will also realize that it is a botched job.