Mycraft
2020-08-10 16:41:02
- #1
 
The calculation is essential for everything, not just for the evaluation of the offer. Everything stands or falls with it.
Both how high the numbers for the pipe lengths etc. turn out, as well as the size of the heat source and the scope of the aggregates and systems necessary for operation...and so on...
Both how high the numbers for the pipe lengths etc. turn out, as well as the size of the heat source and the scope of the aggregates and systems necessary for operation...and so on...