seutore
2020-01-16 07:39:56
- #1
I have no comment on the general contractor; I would have assumed that the contract with the general contractor applies there. We are building with individual contracts and I assume that the commissioning of the heating installer is relevant, so the date on the contract with him!?
Yes, in the situation with an architect it is significantly more relaxed. The timing here is the signature/order with the heating installer. A prior planning service of the system can also be carried out (or by the architect?). If this is done by the installer of the system, I would separate it contractually. That way you should be on the safe side.