Lost trust in sales representatives

  • Erstellt am 2023-03-27 01:42:49

Ari_tau

2023-03-27 14:46:02
  • #1
Of course... contact details are available on the internet, I just wonder if it makes sense and what the consequences are. He will find out and still want his commission.
 

Nida35a

2023-03-27 15:03:44
  • #2
The competitor bashing worked great for you. The fact is, a prefabricated house in solid construction requires months of preparation and after these months, assembly in 2-3 days. :oops: Stone on stone takes a week with standardized stones :rolleyes:. The builders here, who had to be finished in months, from idea to move-in, did not have a prefabricated house. For example or us as well
 

kati1337

2023-03-27 15:37:21
  • #3
I can't tell you anything about sound insulation. We have U 0.5 and RC2 as standard. But do you really need RC2 for a single-family house? I would ask you there whether shutters are included, and if so, whether they are electric? For us, aluminum shutters (electric) were standard. That is often subject to an extra charge with many cheap providers.
 

WilderSueden

2023-03-27 15:44:50
  • #4

I took a look at the website; the wall elements apparently already have the rough installation and the base plaster. So they are much closer to a wooden prefabricated house than to conventional solid construction. But construction is especially slow (whether prefabricated or conventional) mainly if the contractor is poorly organized and there is a lot of downtime between the trades.
 

neo-sciliar

2023-03-27 15:57:13
  • #5
To the OP: you basically know that you will not be building with Lechner Massivhaus. You now have a bad feeling, and with every little thing during the execution that feeling will come back, and at least minor issues will definitely occur.

Leave it, save your energy here and look elsewhere. Others also build beautiful houses. Lechner Massivhaus and the consultant will be able to understand. It just doesn't fit.
 

kati1337

2023-03-27 16:54:51
  • #6


Building stone by stone doesn't take that long now. The actual gluing of the Ytong blocks takes less than 2 weeks for 2 floors. What total construction time did they promise you?
 

Similar topics
29.09.2009Prefabricated house, comparison to noise pollution in solid construction11
22.01.2010Prefab house vs. solid house - Please urgently need advice!!29
01.03.2011Cost of architect services for prefabricated house13
30.05.2012Massive house costs KFW 70 - Prefabricated house65
23.05.2013Comparison of solid house versus prefabricated house39
27.02.2013Turnkey prefabricated house - total price okay?59
17.09.2017Prefab House Forum - Complete house possible for 150,000?29
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
02.09.2013Which heating system for prefab houses: air source heat pump, geothermal, solar, photovoltaic17
29.08.2013Prefabricated house (wood) vs solid construction (stone on stone)11
05.07.2013Solid house or prefabricated house? Which suits us better?18
23.06.2014Prefabricated house or solid construction - what is your opinion?45
25.06.2014Financial requirements for building a prefabricated house55
16.09.2014Ventilation in prefab houses (wood frame with ETICS) also in solid houses?36
29.09.2014200-300 sqm prefabricated house or passive house? Manufacturer? Construction company?29
28.07.2018Did you have RC2 windows installed?63
01.06.2019Advantages and Disadvantages: Raffstore or Roller Shutters?56
17.11.2019Windows with roller shutters in new construction, solution for planning problem?10

Oben