Lost trust in sales representatives

  • Erstellt am 2023-03-27 01:42:49

Ari_tau

2023-03-27 14:46:02
  • #1
Of course... contact details are available on the internet, I just wonder if it makes sense and what the consequences are. He will find out and still want his commission.
 

Nida35a

2023-03-27 15:03:44
  • #2
The competitor bashing worked great for you. The fact is, a prefabricated house in solid construction requires months of preparation and after these months, assembly in 2-3 days. :oops: Stone on stone takes a week with standardized stones :rolleyes:. The builders here, who had to be finished in months, from idea to move-in, did not have a prefabricated house. For example or us as well
 

kati1337

2023-03-27 15:37:21
  • #3
I can't tell you anything about sound insulation. We have U 0.5 and RC2 as standard. But do you really need RC2 for a single-family house? I would ask you there whether shutters are included, and if so, whether they are electric? For us, aluminum shutters (electric) were standard. That is often subject to an extra charge with many cheap providers.
 

WilderSueden

2023-03-27 15:44:50
  • #4

I took a look at the website; the wall elements apparently already have the rough installation and the base plaster. So they are much closer to a wooden prefabricated house than to conventional solid construction. But construction is especially slow (whether prefabricated or conventional) mainly if the contractor is poorly organized and there is a lot of downtime between the trades.
 

neo-sciliar

2023-03-27 15:57:13
  • #5
To the OP: you basically know that you will not be building with Lechner Massivhaus. You now have a bad feeling, and with every little thing during the execution that feeling will come back, and at least minor issues will definitely occur.

Leave it, save your energy here and look elsewhere. Others also build beautiful houses. Lechner Massivhaus and the consultant will be able to understand. It just doesn't fit.
 

kati1337

2023-03-27 16:54:51
  • #6


Building stone by stone doesn't take that long now. The actual gluing of the Ytong blocks takes less than 2 weeks for 2 floors. What total construction time did they promise you?
 

Similar topics
23.06.2014Prefabricated house or solid construction - what is your opinion?45
16.09.2014Ventilation in prefab houses (wood frame with ETICS) also in solid houses?36
29.09.2014200-300 sqm prefabricated house or passive house? Manufacturer? Construction company?29
26.04.2015Semi-detached house architect or general contractor / prefabricated house or solid construction13
24.08.2015Can I afford a prefabricated house?60
15.03.2016Short questions about a prefabricated house offer?31
04.07.2016Multi-family house with 3 or more apartments as a prefabricated house18
28.07.2018Did you have RC2 windows installed?63
02.12.2016Is cost calculation for a prefabricated house feasible? Are there additional costs?26
22.12.2016Which is the cheapest prefab house with the largest number of rooms?12
23.02.2019Prefabricated house 1980 - Very well maintained condition16
01.06.2019Advantages and Disadvantages: Raffstore or Roller Shutters?56
22.06.2019Exclusive land list of prefabricated house providers17
16.12.2021Which prefabricated house provider - prices, experiences?212
17.11.2019Windows with roller shutters in new construction, solution for planning problem?10
12.11.201952
21.12.2019Prefabricated house or solid house16
13.02.2020Would you build a prefab house again?15
09.06.2021House construction planning: solid house or prefabricated house? With or without a basement?80

Oben